ULARA Salt and Nutrient Management Plan
Technical Memorandum No. 4
Management Measures



The ULARA Watermaster is pleased to announce the availability of the Final Version of Technical Memorandum No. 4 - Management Measures (TM-4). TM-4 was prepared for the ULARA Watermaster by RMC Water and Environment. The purpose of TM-4 is to identify and characterize the management measures in the ULARA Salt and Nutrient Management Plan with the focus on potential salt and nutrient impacts over a 2025 planning horizon.

A public comment period was open for 30 days, beginning March 11, 2016 and ending on April 11, 2016. The Final version of TM-4 can be downloaded by clicking the link below. Comments received during that comment period and responses to those comments can be viewed via the link below.

As a reminder, for various reasons, the ULARA Salt and Nutrient Management Plan Technical Memoranda are being prepared and released in a different order than originally envisioned.

If you have any questions, please email us at SNMP@ULARAwatermaster.com.

ULARA SNMP TM-4 FINAL PUBLIC DRAFT 7-13-2016
1.7MB PDF

ULARA SNMP TM-4 Comment Matrix 2016-07-13
220KB PDF

ULARA SNMP Calendar



upcoming


July 13, 2017


Public Meeting to present results of mixing model


Click here for details

upcoming


June 2017


TM-5 (Mixing Model) will be released for public review



upcoming


June 2017


TM-2 (Background Data) will be released for public review



September 23, 2016


TM-3 Public Comment Period Ends



August 23, 2016
TM-3 Public Comment


Tech Memo No. 3 Draft released for Public Comment


Download TM-3 Here

July 26, 2016


Final Versions of TM-1 and TM-4 and public comments received now available



April 11, 2016


TM-4 Public Comment Period Ends



April 4, 2016


TM-1 Public Comment Period Ends



March 11, 2016
TM-4 Public Comment


Tech Memo No. 4 Draft released for Public Comment


Download TM-4 Here

March 4, 2016
TM-1 Public Comment


Tech Memo No. 1 Draft released for Public Comment


Download TM-1 Here