SNMP Due Date Extension



On April 16, 2014, the ULARA Watermaster formally requested a due-date extension to May 2016 for the SNMP for the ULARA groundwater basins. A request letter was provided to the Los Angeles Regional Water Quality Control Board (LARWQCB)that detailed a chronology of the work that had been performed through April 2014. On May 6, 2014, the LARWQCB approved the Due-Date extension request. Both the request letter from the ULARA Watermaster, and the approval letter from the LARWQCB are provided below:

April 16, 2014 Request Letter

777KB PDF

May 6, 2014 Response Letter

1.2MB PDF

ULARA SNMP Calendar



October 17, 2017


Public CEQA Scoping Meeting


Click here for details

August 2, 2017


TM-2 and TM-5 Public Comment Period Ends



July 13, 2017


Public Meeting to present results of mixing model


Click here for details

July 3, 2017
TM-5 Public Comment


Tech Memo No. 5 Draft released for Public Comment


Download TM-5 Here

July 3, 2017
TM-2 Public Comment


Tech Memo No. 2 Draft released for Public Comment


Download TM-2 Here

September 23, 2016


TM-3 Public Comment Period Ends



August 23, 2016
TM-3 Public Comment


Tech Memo No. 3 Draft released for Public Comment


Download TM-3 Here

July 26, 2016


Final Versions of TM-1 and TM-4 and public comments received now available



April 11, 2016


TM-4 Public Comment Period Ends



April 4, 2016


TM-1 Public Comment Period Ends



March 11, 2016
TM-4 Public Comment


Tech Memo No. 4 Draft released for Public Comment


Download TM-4 Here

March 4, 2016
TM-1 Public Comment


Tech Memo No. 1 Draft released for Public Comment


Download TM-1 Here