SNMP Due Date Extension



On April 16, 2014, the ULARA Watermaster formally requested a due-date extension to May 2016 for the SNMP for the ULARA groundwater basins. A request letter was provided to the Los Angeles Regional Water Quality Control Board (LARWQCB)that detailed a chronology of the work that had been performed through April 2014. On May 6, 2014, the LARWQCB approved the Due-Date extension request. Both the request letter from the ULARA Watermaster, and the approval letter from the LARWQCB are provided below:

April 16, 2014 Request Letter

777KB PDF

May 6, 2014 Response Letter

1.2MB PDF

ULARA SNMP Calendar



January 29, 2018
TM-5 Updated


Tech Memo No. 5 Revised Draft released


Download TM-5 Here

October 27, 2017


CEQA Scoping Comment Period Ends


Click here for details

October 17, 2017


Public CEQA Scoping Meeting


Click here for details

August 2, 2017


TM-2 and TM-5 Public Comment Period Ends



July 13, 2017


Public Meeting to present results of mixing model


Click here for details

July 3, 2017
TM-5 Public Comment


Tech Memo No. 5 Draft released for Public Comment


Download TM-5 Here

July 3, 2017
TM-2 Public Comment


Tech Memo No. 2 Draft released for Public Comment


Download TM-2 Here

September 23, 2016


TM-3 Public Comment Period Ends



August 23, 2016
TM-3 Public Comment


Tech Memo No. 3 Draft released for Public Comment


Download TM-3 Here

July 26, 2016


Final Versions of TM-1 and TM-4 and public comments received now available



April 11, 2016


TM-4 Public Comment Period Ends



April 4, 2016


TM-1 Public Comment Period Ends



March 11, 2016
TM-4 Public Comment


Tech Memo No. 4 Draft released for Public Comment


Download TM-4 Here

March 4, 2016
TM-1 Public Comment


Tech Memo No. 1 Draft released for Public Comment


Download TM-1 Here