Ulara
- Welcome
- News
- About
- ULARA Basins
- Data Requests/LID
- Document Library
- Salt & Nutrient
- CEQA Scoping Meeting, Oct 17, 2017
- Public Meeting, July 13, 2017
- ULARA SNMP Tech Memo No. 5
- ULARA SNMP Tech Memo No. 2
- ULARA SNMP Tech Memo No. 3
- ULARA SNMP Tech Memo No. 4
- ULARA SNMP Tech Memo No. 1
- December 4, 2014 SNMP Workshop
- SNMP Due-Date Extension April 16, 2014
- Meeting Minutes November 19, 2013 Public Kick-off Meeting
- Contact
- CEQA Scoping Meeting, Oct 17, 2017
- Public Meeting, July 13, 2017
- ULARA SNMP Tech Memo No. 5
- ULARA SNMP Tech Memo No. 2
- ULARA SNMP Tech Memo No. 3
- ULARA SNMP Tech Memo No. 4
- ULARA SNMP Tech Memo No. 1
- December 4, 2014 SNMP Workshop
- SNMP Due-Date Extension April 16, 2014
- Meeting Minutes November 19, 2013 Public Kick-off Meeting
SNMP Due Date Extension
On April 16, 2014, the ULARA Watermaster formally requested a due-date extension to May 2016 for the SNMP for the ULARA groundwater basins. A request letter was provided to the Los Angeles Regional Water Quality Control Board (LARWQCB)that detailed a chronology of the work that had been performed through April 2014. On May 6, 2014, the LARWQCB approved the Due-Date extension request. Both the request letter from the ULARA Watermaster, and the approval letter from the LARWQCB are provided below:
April 16, 2014 Request Letter
777KB PDF
May 6, 2014 Response Letter
1.2MB PDF
ULARA SNMP Calendar
January 29, 2018
TM-5 Updated
Tech Memo No. 5 Revised Draft released
Download TM-5 Here
October 27, 2017
CEQA Scoping Comment Period Ends
Click here for details
October 17, 2017
Public CEQA Scoping Meeting
Click here for details
August 2, 2017
TM-2 and TM-5 Public Comment Period Ends
July 13, 2017
Public Meeting to present results of mixing model
Click here for details
July 3, 2017
TM-5 Public Comment
Tech Memo No. 5 Draft released for Public Comment
Download TM-5 Here
July 3, 2017
TM-2 Public Comment
Tech Memo No. 2 Draft released for Public Comment
Download TM-2 Here
September 23, 2016
TM-3 Public Comment Period Ends
August 23, 2016
TM-3 Public Comment
Tech Memo No. 3 Draft released for Public Comment
Download TM-3 Here
July 26, 2016
Final Versions of TM-1 and TM-4 and public comments received now available
April 11, 2016
TM-4 Public Comment Period Ends
April 4, 2016
TM-1 Public Comment Period Ends
March 11, 2016
TM-4 Public Comment
Tech Memo No. 4 Draft released for Public Comment
Download TM-4 Here
March 4, 2016
TM-1 Public Comment
Tech Memo No. 1 Draft released for Public Comment
Download TM-1 Here